Wednesday, August 26, 2009

Upgrading BizTalk 2006 R2 to 2009

Found this interesting blog via Twitter.

I could not fully understand the reason for failure or the conditions for failure in this very very condensed blog. From what I gather, here is the contention point:

 

1) project was done in both BizTalk 2006 R2 and Visual Studio 2005.

2) Upgrade was to both BizTalk 2009 and Visual Studio 2008

 

It seems that the btoj files are not updated correctly and it requires multiple manual tweaks to get these BizTalk projects to be upgradable and recognized by VS 2008.

No comments: